Digital Engineering

DIGITAL ENGINEERING

Mining:

Rationalization, simulation, analysis and critical activities/resources definition.

 

 

 

• Constructability Reports and Construction Staging Diagrams as part of the TfNSW Concept Design;
• Compilation of Sydney Trains Possession Configuration and Possession Calendar information required for detailed project review at Construction Staging Workshops; and
• Assisted with submission of Electrical Operating Diagram Advice of Alteration(s).

Undertaken work for various clients, including the following projects:

HEAVY RAIL

• Parramatta Turnback Project
• Western Sydney Rail Upgrade
• Clyde Junction Project: Stage 12 Project at Auburn NSW / Stage 13 at Clyde and Granville NSW.
• North Strathfield Rail Underpass Project.
• Sydney Rail Futures (SRF) Stage 2 (2019-2025 Projects)
• Northern Sydney Freight Corridor Program: Rhodes to West Ryde Quadruplication, Project definition design / Berowra to Hawkesbury River Triplication, Project definition design.
• Northern Sydney Freight Corridor Program: Stage 2 – Lower Main North Quadruplication Lite – Up Relief Extension [NSRU Alliance]
• Wyong station upgrade & NIF
• NIF SSEW Program (20 Stations)
• Kiama to Bomaderry Upgrade

METRO – Sydney Metro City & Southwest [Aecom/PB/Cox/Hassell]

• Northern Corridor System Wide
• Central Station: Footbridge, Sydney Yard Access Bridge (SYAB), Northern Entry
• Bankstown Line: Bankstown, Belmore, Campsie, Dulwich Hill, Punchbowl – Punchbowl Stabling, Sydenham, Hurlstone Park, Lakemba, Marrickville, Canterbury, Wiley Park

LIGHT RAIL

– Inner West Light Rail
– Canberra Light Rail
– Parramatta Light Rail

 

STABLING YARDS

• Cudgegong SMTF
• South Eveleigh Intercity Service Centre
• Hornsby Planning Services, Hornsby Junction Remodelling
• Regional Stabling Options [CARDNO]

ELECTRICAL

• Substations: Chalmers Substation / Guildford Substation [BECA]
• ARTC OHW removal POD

TAP (TRANSPORT ACCESS PROGRAM)

• Arncliffe Pedestrian Access Project

SIGNALLING

• Granville to Westmead Resignalling

TUNNELS

• Sydney Metro
• Cross River Rail (Brisbane)

 

 

 

 

 

 

2018

  • Brisbane – Brisbane Live Arena, Constructability Review
  • Brisbane, CRR – Nothern and Southern Portals, Constructability Review
  • Brisbane, CRR – Mayne Yard Remodelling
  • Perth – Claremont Station, Constructability Review
  • Sydney, Metro – Sydenham Stabling, Constructability Review
  • Sydney, TfNSW – Westmead Overbridge Options, Strategic Cost Estimate and Construction Report
  • Sydney Gateway
  • T4 Upgrade Constructability Consultant
  • Inland Rail – Workforce Planning
  • Emu Plains Noise Wall Trial
  • Services impact on Commercial Development Sites

2012 – 2017

  • PLR Constructability Advisor
  • SWCSW – SMTF Expansion Cudgegong Rd
  • I&S Kiama – Bomaderry scope development
  • Canberra Light Rail Phase 2
  • NIF Ancillary Works Staging Review
  • NIF Constructability
  • Wyong & NIF
  • OHW Removal Support PBRL
  • AEC Macarthur Development
  • Thornleigh to Hornsby Third Track
  • Illawarra Corridor Study
  • Western Sydney Freight Initiatives
  • Parramatta Turnback Project
  • South Eveleigh Intercity Service Centre
  • Hornsby Planning Services
  • Regional Stabling Options
  • Technical Advisor Support for Substations
  • Sydney Metro – City and Southwest
  • Sydney Rapid Transit
  • SRF Stage 2